NUAI · New Era Energy & Digital
Conviction · Low · not more likely to lead the S&P 500 over the next three months
Note written ·
The last three months
Down 14.4% since the close; the S&P 500 is down 5.5% over the same sessions. Figures in the note can cover a different window.
Daily closes, to . The pale line is the 50-day average, $4.26 on .
Kill line · what would prove the call wrong
Binding Phase 1 lease at Texas Critical Data Centers, disclosed in an 8-K or the fiscal 2026 annual report signed, covering at least 200 megawatts, known by March 2027.
Named on . Settled by . Once its report or event is due, the note is queued for a re-read; if the result meets it, the rating changes on that fact. Since the rating rule of 20 November 2026, a price alone never changes the rating.
Research onlyNot in the portfolio.
The business · as of
Developer of Texas Critical Data Centers, a power-backed AI data-center campus in Ector County, Texas, to be leased to large technology tenants; current revenue is small legacy energy sales, $0.1 million in the quarter to 30 September 2026.
What is changing, and what follows · as of
- What is changing now
- On 12 November 2026 the company's 8-K disclosed a 20-year contract for at least 200 and up to 207 megawatts of firm power for Phase 1, with power expected in the third quarter of 2027; the Phase 1 lease remains under a non-binding letter of intent.
- What follows for the company
- The company posted $118 million of cash collateral for the power contract and sold 23,272,727 new shares at $2.75 to repay Macquarie borrowings; net loss was $17 million in the quarter to 30 September 2026.
- What follows for its customers, suppliers and competitors
- Vistra (VST), through its Luminant affiliate, gains a 20-year buyer for Odessa plant output; the unnamed technology tenant in exclusive talks gains Texas capacity outside the ERCOT large-load queue.
What the price assumes · on figures filed to
At the 20 November 2026 close (filed inputs to 12 November 2026) EV/sales is 365.1 and P/B 2.7 on a $430 million enterprise value; the price assumes a signed lease and rent from late 2027, while the evidence shows only a non-binding letter of intent.
Key figures from the filings · Energy
Quarter to 30 September 2026, filed 12 November 2026; valuation at the 23 November 2026 close
The last six quarters
- Revenue, latest quarter ($M)
- 0.1
- Revenue, change on a year (%)
- −7.4
- Operating margin (%)
- −11623.5
- Net cash, cash less debt ($M)
- 102
- Enterprise value to sales (×)
- 432.0
All filed numbers
What New Era Energy & Digital reports to the SEC in its quarterly and annual filings. Each group states its period and filing date once; a figure dated otherwise says so. Built from the filings known on .
| Quarter to | Revenue ($M) | On a year (%) | Operating margin (%) |
|---|---|---|---|
| first filed | 0.1 | −7.4 | −11623.5 |
| first filed | 0.0 | −82.5 | −46254.6 |
| first filed | 0.8 | +145.8 | −948.2 |
| first filed | 0.2 | +28.6 | −8594.9 |
| first filed | 0.2 | +353.6 | −2637.1 |
| first filed | 0.2 | +926.2 | −891.3 |
| Pre-tax income ($M) | −16.6 |
|---|---|
| Net income ($M) four quarters: −64.7 | −16.6 |
| Diluted shares, change on a year (%) against the quarter to 30 September 2025 | +264.8 |
| Operating cash flow ($M) | −23.5 |
|---|---|
| Capital spending ($M) | Not available |
| Free cash flow ($M) | Not available |
| Cash and short-term investments ($M) | 118 |
|---|---|
| Debt ($M) notes | 15.9 |
| Net cash, cash less debt ($M) | 102 |
| Deferred revenue ($M) | Not reported |
| Backlog, orders not yet delivered ($M) | Not reported |
| Receivables ($M) | 1.0 |
| Inventory ($M) | Not reported |
| Shareholders' equity ($M) | 193 |
| Market value ($M) | 610 |
|---|---|
| Enterprise value, market value plus net debt ($M) | 508 |
| Enterprise value to sales (×) | 432.0 |
| Enterprise value to operating income (×) | Not meaningful |
| Price to earnings (×) | Not meaningful |
| Price to book value (×) | 3.2 |
| Free-cash-flow yield (%) | Not available |
Short interest (FINRA, settled 30 October 2026, published 10 November 2026): 23.6% of shares outstanding sold short, 3.1 days of average trading to cover, +6.5% since the previous report.
| Window | Bought | Sold |
|---|---|---|
| 90 days | Not available yet | Not available yet |
| 12 months | Not available yet | Not available yet |
Linked companies · as of
- Suppliers:
- VST
The thesis
New Era Energy & Digital is more likely to lag the S&P 500 over the next three months. Its Texas data-center campus now has up to 207 megawatts of contracted power but no signed tenant, and the shares carry fresh dilution and registered resale supply. The fiscal 2026 annual report, expected by March 2027, shows whether a binding Phase 1 lease has replaced the non-binding letter of intent.
The company, formerly a Permian Basin energy producer, is building Texas Critical Data Centers (TCDC), a campus in Ector County, Texas, for large AI computing tenants. On 12 November 2026 its 8-K disclosed a 20-year power purchase agreement with Luminant and ET Services Company, affiliates of Vistra (VST). The agreement covers at least 200 and up to 207 megawatts of firm power from Vistra's Odessa plant. Power is expected in the third quarter of 2027 and first ready-for-service in the fourth quarter of 2027.
Power alone does not earn rent. The same 8-K says the Phase 1 lease is still in "advanced negotiations" under a non-binding letter of intent covering Phases 1 and 2, and no lease has been executed. Until one is, the business earns almost nothing: revenue was $0.1 million and net loss $17 million in the quarter to 30 September 2026 (Form 10-Q filed 12 November 2026). At the 20 November 2026 close (filed inputs to 12 November 2026) the market value is $531 million and enterprise value $430 million, or 365.1 times sales and 2.7 times book. The price already pays for a project. The likelier reading is that the shares trade on lease headlines and share supply until a tenant signs. The rating is Low because the decisive event has no date and the share count keeps rising.
Bullish and bearish views on New Era Energy & Digital, Inc.
The bull case on New Era Energy & Digital, Inc. (NUAI), in brief: firm power from an existing plant. The bear case: no signed tenant yet.
Bull case
- Firm power from an existing plant. The 12 November 2026 8-K ties Phase 1 to Vistra's 1,180-megawatt Odessa plant through a behind-the-meter private network outside the ERCOT "Batch Zero" interconnection process, which removes the grid-queue wait many Texas projects face.
- Exclusive talks with a large tenant. The company describes the counterparty to its non-binding letter of intent as a "leading global technology company", with exclusivity, covering Phases 1 and 2 (Q3 2026 business update, 12 November 2026).
- Financing waits behind a lease. The 8-K names up to $200 million of post-lease financing from Macquarie, subject to conditions, and a plan to release restricted cash by restructuring the letter of credit once a lease is signed.
- Net cash covers current burn. Cash and short-term investments were $118 million against $16 million of notes at 30 September 2026, while operating cash flow was −$23 million over the four quarters to that date (Form 10-Q filed 12 November 2026).
- A broker raised its target after the report. Roth Capital lifted its price target to $17 from $7 on 13 November 2026, the day after the results.
Bear case
- No signed tenant yet. The 12 November 2026 8-K states no Phase 1 lease has been executed; a letter of intent can lapse without penalty to the tenant.
- Most of the cash is pledged. The company reported $187 million of cash at 31 October 2026, of which $138 million was restricted and $49 million unrestricted (business update, 12 November 2026); $118 million backs the power contract's letter of credit.
- Dilution is heavy and recent. The diluted share count rose 264.8% from a year earlier in the quarter to 30 September 2026 (Form 10-Q), and on 29 October 2026 the company agreed to sell 23,272,727 new shares at $2.75 for about $64 million, largely to repay Macquarie borrowings.
- Registered resale supply. A filing reported on 16 November 2026 registers up to 23.69 million shares for resale by selling stockholders, with no proceeds to the company.
- A large holder sold. Kent C. McCarthy, a 10% owner, sold 4,290,000 shares on 14 October 2026 at an average of $3.62 (SEC Form 4 filed 16 October 2026).
- The price assumes the project. EV/sales of 365.1 at the 20 November 2026 close rests on revenue of $0.1 million a quarter and a four-quarter net loss of $65 million.
Price setup · as of
The shares closed at $3.78 on 20 November 2026, below the 50-day moving average of $4.28 and the 200-day moving average of $4.74. The 3-month change is −21.5%, measured from a $4.82 close on 24 August 2026. The last close sits 60.0% below the 52-week intraday high of $9.45 set on 22 January 2026.
The 52-week closing low of $1.63 came on 5 November 2026, a week after the $2.75 share sale was priced. The shares closed at $3.20 on 13 November 2026 after the results and power contract, then $3.11 on 16 November 2026, $3.20 on 17 November 2026, $3.99 on 18 November 2026, $4.28 on 19 November 2026 and $3.78 on 20 November 2026. Kalkine reported no company announcement behind the 18 November 2026 rise. Across liquid US stocks, no reliable effect of a one-day jump on the following three months has been found so far.
The levels the case turns on are the $2.75 share-sale price of 29 October 2026, the $3.62 average of the 10% owner's sale on 14 October 2026, and the 200-day average of $4.74. Swings of this size around news and resale filings are what a pre-revenue developer with a rising share count tends to show.
Catalysts ahead
- ~December 2026 (est.): SEC effectiveness of the resale registration covering up to 23.69 million shares. Once effective, selling stockholders, including the October private-placement buyers, can sell freely, adding supply while no lease is signed.
- ~March 2027 (est.): Fiscal 2026 annual report and business update. Shows whether the Phase 1 lease has been signed and on what terms, how much cash remains unrestricted, and whether the third-quarter 2027 power date still holds.
What it trades with · as of
The shares trade as a single-project AI data-center developer. Their moves on 12 November 2026 and 18 November 2026 tracked company news and AI data-center sentiment more than the S&P 500. The business is linked to Vistra (VST) as the Phase 1 power supplier, and to the pace of hyperscale AI computing demand, since the unnamed tenant's decision sets the timing of all revenue. A common market view is that small AI-infrastructure developers rise and fall together on large-cap AI spending news; that is a belief, and the stronger driver here is company-specific: the lease, the resale registration and any further share issuance.
Caveats
- Selling stockholders have registered up to 23.69 million shares for resale; the company receives no proceeds from those sales. Resale registration statement reported 16 November 2026 · as of
- $118 million of company cash is posted as collateral for the Phase 1 power contract's letter of credit and is not available for operations until released. Form 8-K, 12 November 2026 · as of
The evidence, claim by claim (8)
- 20-year power purchase agreement with Luminant and ET Services Company, Vistra affiliates, for at least 200 and up to 207 megawatts of firm power from the Odessa plant; power expected in the third quarter of 2027, first ready-for-service in the fourth quarter of 2027. Form 8-K, 12 November 2026 · as of
- No Phase 1 lease executed; lease documentation in advanced negotiation under a non-binding letter of intent covering Phases 1 and 2; up to $200 million of post-lease Macquarie financing available subject to conditions. Form 8-K, 12 November 2026 · as of
- Revenue $0.1 million and net loss $17 million in the quarter to 30 September 2026; net loss $65 million and operating cash flow −$23 million over four quarters. Form 10-Q for the third quarter of 2026 · as of
- Cash of $187 million at 31 October 2026, of which $138 million restricted and $49 million unrestricted. Q3 2026 business update, 12 November 2026 · as of
- Private placement of 23,272,727 shares at $2.75 for about $64 million, proceeds largely to repay Macquarie borrowings. Company press release and Form 8-K, 29 October 2026 · as of
- Diluted share count up 264.8% from a year earlier in the quarter to 30 September 2026. Form 10-Q for the third quarter of 2026 · as of
- 10% owner Kent C. McCarthy sold 4,290,000 shares in the open market at an average of $3.62. SEC Form 4 filed 16 October 2026 · as of
- Roth Capital raised its price target to $17 from $7 after the third-quarter report. Roth Capital, reported 14 November 2026 · as of
Sources
- $118M in cash collateral backs a 20-year power deal for New ERA Energy & Digital (NUAI). · stocktitan.net ·
- Black Friday Get Elite for just $149.00 Claim Now · finviz.com
- Finviz
- New Era Energy & Digital Inc (NUAI) Stockholders Plan to Sell 23.69M Shares Without Company Participation · gurufocus.com
- Did New Era Energy & Digital (NASDAQ:NUAI) Really Rise 25% on November 18 With Nothing New to Report? · kalkine.ca
- Earnings Whispers
Related · shared themes
NCPL
Netcapital
Netcapital's shares are more likely to lag the S&P 500 over three months: a 971.6% three-month rise rests on no audited results since…
ONDS
Ondas
Ondas Inc. shares are more likely to lag the S&P 500 over three months: the 12 November 2026 report beat on revenue but halved gross margin…
OPEN
Opendoor Technologies
Opendoor Technologies is more likely to lag the S&P 500 over three months. It guided a wider fourth-quarter adjusted EBITDA loss of $70–85…
COOK
Traeger
Traeger's shares still trade well ahead of a business whose third-quarter 2026 revenue fell 40.4%, so they are more likely to lag than…