Skip to content
FrontierPicks

Stocks · Theme · 129 research notes

AI datacenter infrastructure stocks

129 AI datacenter infrastructure stocks with a dated research note: thesis, kill line and next catalyst.

Dormant themeNot among the research's current themes (last active 19 October 2026). Each stock's note below is dated on its own.

All 129 have a dated research note. Every research note carries a kill line, published in advance; on a stock the portfolio holds, the page lists what would end the case instead.What a kill line is →

All stocks
AMZNAmazon.comMedium Amazon.com's shares are modestly more likely to beat the S&P 500 over three months because AWS cloud revenue grew 39% on a $578 billion backlog; the fourth-quarter report expected around 4 February 2027 shows whether that growth holds and…Mega-cap AI platforms · AI datacenter infrastructurewritten · catalyst MSFTMicrosoftMedium Microsoft's shares are modestly more likely to lead the S&P 500 over three months because Azure grew 48% excluding currency in the September 2026 quarter, is guided to 49–50% for December, and backlog rose 71.6% to $683 billion. The fiscal…Mega-cap AI platforms · AI enterprise softwarewritten · catalyst NVDANVIDIAMedium NVIDIA's shares are modestly more likely to beat the S&P 500 over three months: a $115.8 billion October quarter and a $130.0 billion January outlook outweigh open probes and new Southeast Asia shipment curbs. The 10-Q due by 4 December…AI chips & memory · AI datacenter infrastructurewritten · catalyst POWLPowell IndustriesMedium Powell Industries' shares are modestly more likely to lead the S&P 500 over three months because a record $2.7 billion backlog is converting at wider margins; the fiscal first-quarter 2027 report, expected about 3 February 2027, shows…Industrial power & grid · AI datacenter infrastructurewritten · catalyst BABAAlibaba Group HoldingMedium Alibaba's shares are modestly more likely to lead the S&P 500 over three months because cloud revenue grew 53% in the September quarter. The December-quarter report, expected around 19 February 2027, shows whether that growth holds after…AI datacenter infrastructure · AI enterprise softwarewritten · catalyst CARRCarrier GlobalMedium Carrier Global is modestly more likely to beat the S&P 500 over three months because record orders and an $8.5 billion backlog should outrun the input-cost squeeze. The fourth-quarter report expected in February 2027, with first 2027…AI datacenter infrastructure · Cyclical industrialswritten · catalyst CBRECBRE GroupMedium CBRE Group is modestly more likely than not to beat the S&P 500 over three months, because September-quarter core earnings rose 28% while the shares fell 11.2%. The fourth-quarter report expected in February 2027 settles it by testing the…AI datacenter infrastructurewritten · catalyst CBRSCerebras SystemsMedium Cerebras Systems is modestly more likely than not to beat the S&P 500 over three months, because it guided fourth-quarter core revenue to $310–330 million against a $271.1 million consensus and added Microsoft as a cloud customer. The…AI chips & memory · GPU cloud & neocloudswritten · catalyst CDWMedium CDW Corporation is modestly more likely to beat the S&P 500 over three months: AI server sales lifted third-quarter gross profit 10% and margin recovered to 20.5%. The fourth-quarter report, expected around February 2027, settles whether…AI datacenter infrastructurewritten · catalyst CEGConstellation EnergyMedium Constellation Energy's shares are modestly more likely than not to beat the S&P 500 over three months: earnings guidance rose to $12.50–$12.80 while an AI sell-off erased the post-report gain. The fourth-quarter report and 2027 guidance,…Nuclear & uranium · Industrial power & gridwritten · catalyst CMICumminsMedium Cummins shares are modestly more likely than not to beat the S&P 500 over the next three months: a 27.9% three-month fall leaves them at 16.5 times earnings after record third-quarter margins, and the February 2027 fourth-quarter report…AI datacenter infrastructure · Cyclical industrialswritten · catalyst COHRCoherentMedium Coherent is more likely than not to beat the S&P 500 over three months: revenue grew 49.9% to $2,370 million, December-quarter guidance is $2.55–2.75 billion and directors bought shares into the November selloff. The fiscal second-quarter…Networking & optical · AI datacenter infrastructurewritten · catalyst DELLDell TechnologiesMedium Dell Technologies' shares look modestly more likely to lead the S&P 500 over three months after fiscal third-quarter revenue of $54.9 billion beat its $49.0 billion guide and the fiscal 2027 outlook rose to $202.0 billion. The fiscal…AI datacenter infrastructurewritten · catalyst DLRDigital Realty TrustMedium Digital Realty's record leasing and raised 2026 outlook make its shares modestly more likely to beat the S&P 500 over three months; the fourth-quarter report and first 2027 guidance, expected in February 2027, settle whether earnings…AI datacenter infrastructurewritten · catalyst ECLEcolabMedium Ecolab's shares are modestly more likely than not to beat the S&P 500 over three months, as organic growth has risen to 7% and data-centre cooling adds a second engine; the fourth-quarter report expected around 10 February 2027 shows…AI datacenter infrastructurewritten · catalyst EMEEMCOR GroupMedium EMCOR Group is modestly more likely to beat the S&P 500 over three months: a record $18,573 million backlog and a third 2026 guidance raise are already reflected in the earnings multiple. The fourth-quarter report expected in late February…AI datacenter infrastructure · Cyclical industrialswritten · catalyst FIXComfort Systems USAMedium Comfort Systems USA is modestly more likely than not to beat the S&P 500 over three months. Third-quarter 2026 revenue rose 53.7% to $3,766 million. Deferred revenue rose 123.3% to $3,872 million, and management set a mid-20% same-store…AI datacenter infrastructurewritten · catalyst FLEXMedium Flex Ltd. is modestly more likely than not to beat the S&P 500 over three months: it raised its fiscal 2027 outlook and secured Axiom's spin-off financing on 17 November 2026, and the third-quarter report expected in early February 2027…AI datacenter infrastructure · Industrial power & gridwritten · catalyst FPSForgent Power SolutionsMedium Forgent Power Solutions is modestly more likely than not to beat the S&P 500 over three months, after a 12 November 2026 beat, a raised fiscal 2027 revenue guide of $2,450–2,650 million and open-market buying by six insiders through 20…Industrial power & grid · AI datacenter infrastructurewritten · catalyst GNRCGenerac HoldingsMedium Generac's shares are modestly more likely to beat the S&P 500 over three months, because its data-center backlog of about $4.5 billion, anchored by an Amazon supply deal, arrived with full-year guidance intact. The fourth-quarter report…AI datacenter infrastructure · Industrial power & gridwritten · catalyst HPEHewlett Packard EnterpriseMedium Hewlett Packard Enterprise's shares are modestly more likely to lead the S&P 500 over three months because a fiscal 2027 revenue guide of $59.4–63.1 billion outruns a lower margin outlook; the fiscal first-quarter 2027 report, expected in…AI datacenter infrastructure · Networking & opticalwritten · catalyst JBLJabilMedium Jabil's shares are modestly more likely than not to beat the S&P 500 over three months: an AI-hardware sell-off has cut them 27.1% while the fiscal 2027 outlook calls for about 24% revenue growth. The report due about 17 December 2026…AI datacenter infrastructurewritten · catalyst JCIJohnson Controls InternationalMedium Johnson Controls is modestly more likely than not to beat the S&P 500 over three months, because fourth-quarter orders rose 44% organically and fiscal 2027 guidance calls for 11–12% organic growth. The fiscal first-quarter report, expected…AI datacenter infrastructurewritten · catalyst KEYSKeysight TechnologiesMedium Keysight Technologies is modestly more likely to lead the S&P 500 over three months, as orders of $2.34 billion, up 53%, and a 20% fiscal 2027 growth target outran the shares' fall; the first-quarter report expected in February 2027 shows…AI datacenter infrastructure · Networking & opticalwritten · catalyst MODModexus SolutionsMedium Modexus Solutions (formerly Modine Manufacturing) is modestly more likely to beat the S&P 500 over three months, as reported Samsung takeover talks, Jana Partners' push for a sale and a $500 million buyback support the shares. Fiscal…AI datacenter infrastructure · M&A & special situationswritten · catalyst MPWRMonolithic Power SystemsMedium Monolithic Power Systems is modestly more likely than not to beat the S&P 500 over three months because its AI server power-chip sales beat guidance and its outlook rose; its fourth-quarter report, expected about 4 February 2027, shows…AI datacenter infrastructure · Analog semiconductorswritten · catalyst NSITInsight EnterprisesMedium Insight Enterprises' shares are modestly more likely than not to beat the S&P 500 over three months, as raised 2026 adjusted EPS guidance of $13.55–$13.75 and cheap 0.875% convertible funding support earnings; the 2 December 2026 investor…AI datacenter infrastructurewritten · catalyst PEverpureMedium Everpure's 51% revenue growth and raised fiscal-2027 outlook keep its shares modestly more likely to beat the S&P 500 over three months, despite the 20 November 2026 sector selloff; the report expected about 25 February 2027 shows whether…AI datacenter infrastructurewritten · catalyst PLDPrologisMedium Prologis shares are modestly more likely than not to beat the S&P 500 over three months, because rents and same-store income are still rising; the fourth-quarter report expected in January 2027, with the first 2027 outlook, settles whether…M&A & special situations · AI datacenter infrastructurewritten · catalyst PSIXPower Solutions InternationalMedium Power Solutions International is modestly more likely to beat the S&P 500 over three months: a record third quarter and raised second-half outlook are in place, and the fourth-quarter report expected in early March 2027 settles it.Industrial power & grid · AI datacenter infrastructurewritten · catalyst PWRQuanta ServicesMedium Quanta Services is modestly more likely than not to beat the S&P 500 over three months, because a record $63.7 billion backlog and 57% revenue growth support the current valuation; the fourth-quarter report expected in February 2027, with…Industrial power & grid · AI datacenter infrastructurewritten · catalyst TELTE ConnectivityMedium TE Connectivity's record orders, $6.1 billion in the fiscal fourth quarter and up 29%, make its shares modestly more likely than not to beat the S&P 500 over three months. The first-quarter fiscal 2027 report, expected in late January…AI datacenter infrastructure · Cyclical industrialswritten · catalyst TTTrane TechnologiesMedium Trane Technologies' record $12.5 billion backlog, up 73% at 30 September 2026, makes its shares modestly more likely to beat the S&P 500 over three months. The fourth-quarter report and 2027 outlook, expected around late January 2027, show…AI datacenter infrastructure · Cyclical industrialswritten · catalyst TXNTexas InstrumentsMedium Texas Instruments shares are modestly more likely to beat the S&P 500 over three months because its analog upturn lifted third-quarter 2026 revenue 27.7% and Analog Devices' 24 November 2026 outlook showed that demand holding. The…Analog semiconductors · AI datacenter infrastructurewritten · catalyst URIUnited RentalsMedium United Rentals is modestly more likely than not to beat the S&P 500 over three months: third-quarter rental revenue rose 17.8% and 2026 guidance was raised on 21 October 2026. The fourth-quarter report expected in late January 2027, with…Cyclical industrials · AI datacenter infrastructurewritten · catalyst VRTVertiv HoldingsMedium Vertiv Holdings is modestly more likely to beat the S&P 500 over three months: third-quarter sales rose 61% to $4,313 million and guidance went up, while the 34.8% three-month fall came with a market-wide AI sell-off. The fourth-quarter…AI datacenter infrastructurewritten · catalyst VSTVistraMedium Vistra Corp. shares lean toward beating the S&P 500 on 2027 adjusted EBITDA guidance of $7.7–8.5 billion. Texas data-center policy settles it: the December 2026 grid audit and the new governor's first moves after 19 January 2027.Nuclear & uranium · AI datacenter infrastructurewritten · catalyst WMBWilliams CompaniesMedium Williams Companies is modestly more likely than not to beat the S&P 500 over three months: its 2 November 2026 report kept 2026 adjusted EBITDA on track for the upper half of $8.3–8.5 billion while the shares fell 9.8%. Further power…AI datacenter infrastructure · Industrial power & gridwritten · catalyst AAOIApplied OptoelectronicsLow Applied Optoelectronics is more likely to lag the S&P 500 over three months: a $2.2 billion hyperscaler deal signed 24 November 2026 secures 2027 demand, but a DSP chip shortage and a $550 million stock sale hold back delivery and…Networking & optical · AI datacenter infrastructurewritten · catalyst ADIAnalog DevicesLow Analog Devices is more likely to lag the S&P 500 over three months because its 24 November 2026 outlook guides margins and earnings per share lower despite 42% revenue growth; the fiscal first-quarter report expected in February 2027 shows…Analog semiconductors · AI datacenter infrastructurewritten · catalyst AEPAmerican Electric PowerLow American Electric Power's shares are more likely to lag the S&P 500 over three months: its $100 billion plan and 9–11% growth target of 28 October 2026 are now guidance, funded partly by $5.2 billion of new equity. The fourth-quarter…Industrial power & grid · AI datacenter infrastructurewritten · catalyst AKAMAkamai TechnologiesLow Akamai Technologies' AI cloud pivot has a 2027 outlook behind it, but the shares are more likely to lag the S&P 500 over three months: margins fell, debt is rising and Evercore ISI downgraded them. The fourth-quarter report, expected…AI datacenter infrastructure · Cybersecuritywritten · catalyst AMDAdvanced Micro DevicesLow Advanced Micro Devices is more likely to lag than to lead the S&P 500 over three months: an unresolved export-control allegation and a 336.9 million-share warrant resale filing weigh on strong AI-chip growth. The fourth-quarter report…AI chips & memory · AI datacenter infrastructurewritten · catalyst ANETArista NetworksLow Arista Networks' shares are more likely to lag the S&P 500 over three months, as falling deferred revenue, margin pressure and insider sales offset its 2027 guide; the fourth-quarter report expected around 15 February 2027 shows whether…Networking & optical · AI datacenter infrastructurewritten · catalyst APHAmphenolLow Amphenol Corporation's shares look more likely to lag the S&P 500 over three months because investors keep paying less for AI-hardware earnings despite record orders; the fourth-quarter report expected about 27 January 2027 shows whether…AI datacenter infrastructure · Networking & opticalwritten · catalyst APLDApplied DigitalLow Applied Digital is more likely to lag the S&P 500 over three months because its AI data-centre leases are outgrowing its financing. On 24 November 2026 the company moved to a $2.5 billion convertible preferred facility, which funds the gap…AI datacenter infrastructure · GPU cloud & neocloudswritten · catalyst AVGOBroadcomLow Broadcom's shares look more likely to lag the S&P 500 over three months while an unanswered report of a roughly 20% Google cut to 2027 orders for its custom AI chips hangs over them; the 9 December 2026 fourth-quarter report shows whether…AI chips & memory · AI datacenter infrastructurewritten · catalyst BEBloom EnergyLow Bloom Energy shares look more likely to lag the S&P 500 over three months because Oracle's 2.4 GW Project Jupiter, nearly half of product backlog per Enverus, still has no air-permit hearing date; the fourth-quarter 2026 report, expected…AI datacenter infrastructure · Industrial power & gridwritten · catalyst BKRBaker HughesLow Baker Hughes is more likely to lag the S&P 500 over the next three months: its record orders and $46.4 billion backlog are already reported, while Goldman Sachs and BofA cut targets after the results and the shares track the AI power…Oil, energy & geopolitical · AI datacenter infrastructurewritten · catalyst BRUNBoost RunLow Boost Run's shares are more likely to lag the S&P 500 over the next three months: third-quarter 2026 revenue missed, a $13 million-a-month Georgia project slipped to 2027, and its 2027 hardware plan far exceeds its cash. The end-November…GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst CATCaterpillarLow Caterpillar's shares look more likely to lag the S&P 500, as political risk to data-center building and margins near the bottom of target outweigh a record $78 billion backlog. The 2027 outlook, expected around 2 February 2027, shows…Cyclical industrials · Industrial power & gridwritten · catalyst CIENCienaLow Ciena Corporation's shares are more likely to lag the S&P 500 over three months, after Nvidia's 17 November 2026 beat. The 10 December 2026 fiscal-fourth-quarter report tests the $1.700–$1.800 billion revenue guide.Networking & optical · AI datacenter infrastructurewritten · catalyst CRWVCoreWeaveLow CoreWeave's shares are more likely to lag than lead the S&P 500 over three months: revenue is on track, but funding is in doubt after HPE's CEO said on 24 November 2026 that HPE's financing arm avoids neoclouds. The pricing of the planned…GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst CSCOCisco SystemsLow Cisco Systems' shares look more likely to lag the S&P 500 over three months because product order growth slowed to 21% from 35% and backlog grew only 7.7%; the second-quarter fiscal 2027 report expected in mid-February 2027 shows whether…Networking & optical · AI datacenter infrastructurewritten · catalyst DTEDTE EnergyLow DTE Energy is more likely to lag the S&P 500 over three months because its 2027 earnings baseline of $7.59–7.73 a share is flat with 2026 after the Vantage sale. The February 2027 electric rate order and fourth-quarter report settle it;…Industrial power & grid · AI datacenter infrastructurewritten · catalyst EQIXEquinixLow Equinix is more likely to lag the S&P 500 over the next three months: record bookings and a third 2026 guidance raise are real, but a one-time atNorth fee flatters 2026 and new stock and debt fund negative free cash flow. The…AI datacenter infrastructurewritten · catalyst ETNEatonLow Eaton is more likely to lag the S&P 500 over the next three months, as the sell-off in AI power suppliers keeps outweighing its record third quarter; the fourth-quarter report and first 2027 guidance, expected in early February 2027,…AI datacenter infrastructure · Industrial power & gridwritten · catalyst ETREntergyLow Entergy's data-center growth plan is already guided and priced, so the shares are more likely to lag the S&P 500 over three months; the fourth-quarter 2026 report expected in February 2027, with 2027 guidance against the $4.90–$5.20…Industrial power & grid · AI datacenter infrastructurewritten · catalyst EVRGEvergyLow Evergy's data-center load growth is real, but its raised 2026 outlook rests mostly on a hot summer, so the shares are more likely to lag the S&P 500 over three months; the Missouri rate order expected in December 2026 and the report due…Industrial power & grid · AI datacenter infrastructurewritten · catalyst FRMIFermiLow Fermi Inc. shares are more likely to lag the S&P 500 over three months because Project Matador has a paid $200 million hyperscaler prepayment but no signed lease or build financing. The 31 December 2026 customer-agreement and land-lease…AI datacenter infrastructure · Industrial power & gridwritten · catalyst FRVOFervo EnergyLow Fervo Energy shares look more likely to lag the S&P 500 over three months, as an initial public offering (IPO) class action alleging faster well cooling and $116,000 of quarterly revenue outweigh an $11.9 billion backlog. The company's…AI datacenter infrastructure · Solar & clean energywritten · catalyst GEVGE VernovaLow GE Vernova's shares are more likely to lag the S&P 500 over three months because AI-infrastructure selling outlasted Nvidia's 18 November 2026 beat, outweighing orders that nearly doubled. The investor update expected around 9 December…Industrial power & grid · AI datacenter infrastructurewritten · catalyst GLWCorningLow Corning's shares are more likely to lag the S&P 500 over three months because they keep trading with an AI-infrastructure sell-off despite 44% fiber sales growth; the fourth-quarter report expected around 27 January 2027 is the next test…Networking & optical · AI datacenter infrastructurewritten · catalyst GOOGLAlphabetLow Alphabet's shares look more likely to lag the S&P 500 over three months, because its AI build-out now runs on debt and share sales while Search, which pays for it, slows. The fourth-quarter report expected about 2 February 2027, with 2027…Mega-cap AI platforms · AI datacenter infrastructurewritten · catalyst HUBBHubbellLow Hubbell's shares are more likely to lag the S&P 500 over three months: acquisitions drove much of the growth behind its 27 October 2026 outlook raise while utility organic growth ran about 5%, and the fourth-quarter report and 2027 outlook…Industrial power & grid · AI datacenter infrastructurewritten · catalyst IEXIDEXLow IDEX Corporation is more likely to lag the S&P 500 over the next three months: order growth slowed to 13% in the third quarter from 28% as data center orders paused. The fourth-quarter report expected about 2 February 2027, with the first…Cyclical industrials · AI datacenter infrastructurewritten · catalyst IRENLow IREN Limited's shares look more likely to lag the S&P 500 over three months, because its AI cloud ramp trails its own $4 billion operating revenue-rate target and $6 billion of fiscal 2027 funding is still open. The operating annual…GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst IRMIron MountainLow Iron Mountain's shares are more likely to lag the S&P 500 over three months because data center and total revenue growth are slowing and the company carries $17,972 million of debt; the fourth-quarter report expected in February 2027 shows…AI datacenter infrastructurewritten · catalyst LNTAlliant EnergyLow Alliant Energy is more likely to lag than lead the S&P 500 over three months: data-center contracts lift its outlook, but a utility guiding about 8% earnings growth offers little room to outrun the index; the fourth-quarter report expected…Industrial power & grid · AI datacenter infrastructurewritten · catalyst LUMNLumen TechnologiesLow Lumen Technologies is more likely to lag the S&P 500 over three months because its legacy telecom decline still outruns AI fiber growth: third-quarter 2026 revenue fell 12% and free cash flow was negative. The fourth-quarter report,…Networking & optical · AI datacenter infrastructurewritten · catalyst NBISNebius GroupLow Nebius Group's shares are more likely to lag the S&P 500 over three months, because delayed Microsoft capacity and $40–45 billion of planned 2027 spending leave revenue timing and funding unsettled. The fourth-quarter report, expected in…GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst NINiSourceLow NiSource's shares look more likely to lag the S&P 500 over three months. Its data-center deals and 10–11% growth target are public. Free cash flow is negative and a storm review is open. The fourth-quarter report expected about 10 February…Industrial power & grid · AI datacenter infrastructurewritten · catalyst NRGNRG EnergyLow NRG Energy's shares are more likely to lag the S&P 500 over three months, because Texas power prices nearly 40% below plan outweigh its $4 billion plant sale and $3 billion buyback. The data-center agreement due by 31 December 2026 and the…Industrial power & grid · AI datacenter infrastructurewritten · catalyst NTAPNetAppLow NetApp's flash-storage growth and raised fiscal-2027 outlook support its AI-storage case, but Barclays and Guggenheim tie much of the gain to memory-price pass-through, so the shares are more likely to lag the S&P 500 over three months.…AI datacenter infrastructurewritten · catalyst NVTSNavitas SemiconductorLow Navitas Semiconductor's shares are more likely to lag the S&P 500 over three months: the share price rests on $14.0 million of quarterly revenue while costs rise, and NVIDIA's strong 17 November 2026 report did not lift them. The…AI datacenter infrastructure · Analog semiconductorswritten · catalyst ONON SemiconductorLow ON Semiconductor (onsemi) is more likely to lag the S&P 500 over three months: its shares broke lower on 19 November 2026 despite 175% AI data-center revenue growth. The fourth-quarter report, expected around 8 February 2027, shows whether…Analog semiconductors · AI datacenter infrastructurewritten · catalyst ORCLOracleLow Oracle's shares look more likely to lag the S&P 500 over the next three months, as $20 billion of new stock and debt, Microsoft's capacity exit and Applied Digital's demand for guarantees outweigh a $664 billion backlog. The fiscal…AI datacenter infrastructure · GPU cloud & neocloudswritten · catalyst PPLLow PPL Corporation's shares are more likely to lag than lead the S&P 500 over three months: its raised 7–9% earnings growth plan of 6 November 2026 comes with about $3.0 billion of new equity and slower dividend growth, and the fourth-quarter…Industrial power & grid · AI datacenter infrastructurewritten · catalyst RIOTRiot PlatformsLow Riot Platforms shares are more likely to lag than lead the S&P 500 over three months: its $38 billion of AI leases lack announced project debt, and bitcoin's fall below $60,000 on 24 November 2026 squeezes mining cash. The 31 December 2026…AI datacenter infrastructure · Bitcoin minerswritten · catalyst SHAZSharonAI HoldingsLow SharonAI Holdings is more likely to lag the S&P 500 over three months: billing is still small against $9.6 billion of contracts and the GPU build needs more debt. December 2026 acceptances and the January 2027 ramp to a $400–450 million…GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst SMCISuper Micro ComputerLow Super Micro Computer's shares are more likely to lag the S&P 500 over three months as a reported Justice Department probe and a 12.7% gross margin outweigh record sales; the December-quarter report, expected around 2 February 2027, settles…AI datacenter infrastructurewritten · catalyst SNDKSandiskLow Sandisk's shares look more likely to lag the S&P 500 over three months after TrendForce forecast on 19 November 2026 that NAND flash contract prices fall in 2027. Sandisk's fiscal second-quarter report, expected around 28 January 2027,…AI chips & memory · AI datacenter infrastructurewritten · catalyst SOSouthernLow The Southern Company's shares are more likely to lag the S&P 500 over three months, because its data-center earnings beat and raised $4.70 outlook for 2026 are already public. Its February 2027 outlook update through 2031 settles whether…Industrial power & grid · AI datacenter infrastructurewritten · catalyst STXSeagate Technology HoldingsLow Seagate Technology's shares are more likely to lag the S&P 500 over three months: Nvidia's 17 November 2026 beat lifted them only to a $515.90 close, below the 11 November 2026 rebound high. Seagate's late-January 2027 fiscal…AI datacenter infrastructure · AI chips & memorywritten · catalyst TPLTexas Pacific LandLow Texas Pacific Land's shares are more likely to lag the S&P 500 over the next three months: record revenue of $273.4 million is already in the share price, while the all-stock EagleRock deal issues about 14% of the company. The…Oil, energy & geopolitical · AI datacenter infrastructurewritten · catalyst WDCWestern DigitalLow Western Digital is more likely to lag the S&P 500 than lead it over three months, as group selling on AI data-center policy fears and new drive capacity has outweighed its strong December-quarter guide and Nvidia's 17 November 2026 beat.…AI datacenter infrastructure · AI chips & memorywritten · catalyst WULFTeraWulfLow TeraWulf's move from bitcoin miner to AI data-centre landlord is a delivery-timing story: the 6 November 2026 report pushed first CB-4 rent from September to Q4, and the first reported CB-4 rent settles it.GPU cloud & neoclouds · AI datacenter infrastructurewritten · catalyst XEX-EnergyLow X-Energy's shares are more likely to lag the S&P 500 over three months: the NRC approved Dow's Long Mott permit on 9 November 2026, but the 12 November 2026 report showed losses widening and first power stays in the early 2030s. Dow's 2027…Nuclear & uranium · AI datacenter infrastructurewritten · catalyst

Covered

41
Browse another filter